Practicality of replacing a section of ceiling
Hi ABers Would it be impractical to replace the plaster from a section of plaster and lath ceiling with plasterboard? we have a small damaged section in the corner of the room (approximately 3' x 3') which we think may have been caused by condensation from the tumble drier. Could I carefully remove the plaster from that section and replace it without disturbing the rest of the ceiling do you think? I simply can't afford to replace the whole ceiling at the present time. TIA
Answers
Best Answer
No best answer has yet been selected by daginge. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.Definitely, Daggers ............ it's done all the time. If the laths are ok, you'll often find that you can remove the loose plaster, and fix plasterboard right over the laths. Usually, the thickness of old plaster is enough to accommodate 9.5mm board.
Remember to paint around the edge of the old plaster with PVA to stop the suction ........ or the plaster will dry too quickly at the join.
Remember to paint around the edge of the old plaster with PVA to stop the suction ........ or the plaster will dry too quickly at the join.
Yes you can. Messy job it can be though. Lath/ plaster is pretty messy stuff when old .. there may be lots of black or dust on top.
The old-fashioned way (and still a good way) to remove was with a spade!
There will be lots of tacks into the timber joists to remove.
Clear the bad area (the lath may be rotten in parts) and cut section of plasterboard to fit tightly in the gap (you will prob have to use 1/2" board. Chamfer off the old plaster with a sharp knife. Nail up board with long PB/galv. roofing nails. Wet edges well and plaster in flush with 2-coat multi-finish. Finish is not so critical when matching into lath/PB ceiling .. as it will already be lumpy or bendy!
The old-fashioned way (and still a good way) to remove was with a spade!
There will be lots of tacks into the timber joists to remove.
Clear the bad area (the lath may be rotten in parts) and cut section of plasterboard to fit tightly in the gap (you will prob have to use 1/2" board. Chamfer off the old plaster with a sharp knife. Nail up board with long PB/galv. roofing nails. Wet edges well and plaster in flush with 2-coat multi-finish. Finish is not so critical when matching into lath/PB ceiling .. as it will already be lumpy or bendy!
While you're there Dags, a quick tip about holding the rest up.
Stick in a bradawl or something to locate a joist to fix to.......... (this is for anywhere that's a bit floppy) ............ use a zinc plated screw with a bodywasher to tie it back to the joist. (A bodywasher is a big washer, say 30mm, with a small hole in it)
Screw until the head and wasr are below the surface (just) ........ skim over.
Stick in a bradawl or something to locate a joist to fix to.......... (this is for anywhere that's a bit floppy) ............ use a zinc plated screw with a bodywasher to tie it back to the joist. (A bodywasher is a big washer, say 30mm, with a small hole in it)
Screw until the head and wasr are below the surface (just) ........ skim over.