ChatterBank12 mins ago
Opinions on quote, please (cont)
(cont) Connect boiler to 240v mains supply. Make alterations to plumbing in airing cupboard so pipe work is hidden under floor as much as possible and shower supplies are connected to new hot and cold supplies. Thoroughly power flush entire heating system, leave corrosion proof inhibitor in system. Commission boiler, test and leave working.
Labour and Materials � 1790:00 + vat
Extras
Upgrade boiler to 30Si � 70:00 + vat
Upgrade boiler to 30 Cdi � 150:00 + vat
Plume management kit (if needed) � 45:00 + vat
Answers
No best answer has yet been selected by CW1. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.raysparx, thanks for that. That's really made me feel better ! :o) Specially after checking that website. At the mo' I have 2 thermostats - one in the dining room (not used, I don't think) and one in the lounge. he's quoted me for a wireless one.
sandbach99 - already did that ;o) The company's registered, rather than the 'fitter'. S'pose that means ALL their fitters need to be up to scratch ?
I'm a bit concerned about the shower being compatible tho'. The fitter reckons it should be ok but as I've no idea when the bathroom'll be refitted, should isn't really the answer I need. The shower's really old, no manufacturer's mark, and on a hose, plumbed into the wall.