Question Author
building works going ok but they stripped the roof when the loft steels hadn't arrived and it has been now 3 weeks due to steel delay the entire house has been exposed in all sorts of weather. They didn't put an over roof over, or cover the house with basic tarpaulin, they said there was no way they could cover it, so they are instead leaving exposed and when water tight again using industrial dehumidifiers. The house is being fairly well stripped out but it will still effect the house and mean it takes time before it drys out to allow the dry lining to be fitted. They said anything damaged by the rain will be fixed I just hope my project manager does his job and finds any damage. Assuming the original floor boards are damaged and bowed, they don't seem to want to replace them for same and want to put chip board down, my project manger supports them.