i need to knock up 1.9m of concrete whats the best way to work out ballast / and cement that im going to need for this amount ??


Cheers

Si
Gravatar

Answers

1 to 4 of 4rss feed

Best Answer

No best answer has yet been selected by FIRE5149. Once a best answer has been selected, it will be shown here.

For more on marking an answer as the "Best Answer", please visit our FAQ.
This depends entirely on what purpose the concrete is intended to serve. For the weakest concrete useable for example as load bearing fill you could use less than 100kg of cement per cubic metre, for very strong structural concrete it would exced 300kg per cubic metre.
basically 3 buckets of ballast to one bucket of cement should be fine
Do you mean a length of 1.9m. If so we need to know the volume. If you mean 1.9 cubic metres, thats about 4.1 tonnes which is a hell of a lot of knocking up! You'd be better off ordering it ona mini mixer or an on site mixer truck (like Mix a mate used to be).
Question Author
yeah 1.9 cubic i have ordered it now and will knock it up by hand will take a few hours but should be ok i knock it up at work but never this much but im sure all will be ok