Approximate plumbing/ tiling estimate
9 Answers
We have had a quote for replacing bathroom suite and doing the tiling. Everything will be in the same position as before, and we will be paying for all the fittings, etc. I would be grateful if anyone could give me a rough idea of the hourly rate that should be charged, or even a very rough estimate of the price for the job. Tiling would be about 11 sq yds.
It would be greatly appreciated if you could help.
It would be greatly appreciated if you could help.
Answers
Best Answer
No best answer has yet been selected by sixpence. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.Actual quotes I received ; to put in a new suite (supplied by me) and replumb to change the layout, tiling as well; �1300.
To do the above without tiling, plus replumb kitchen to include fitting sink, running supply and waste for wash machine and dish washer �700.
I hired the �700 team. They did some extra work including gas supply and fit a cooker. The bill? Still �700.
His firm are currently finishing installing 11 rad central heating, replumb of our large renovation property comprising 2 replanned bathrooms, plumbing and gas to our moved kitchen (even cutting hole and fitting hob), utility room and new downstairs wc. We have supplied sanitaryware and kitchen. Quote �5k. 2 plumbers on site most of 8 days. I am very happy with the price and the work.
It is not all price tho. The guys I have employed are part of a 5 man team. Although they are busy it means less of a wait for them than for a plumber working solo. And that is sometimes important.
To do the above without tiling, plus replumb kitchen to include fitting sink, running supply and waste for wash machine and dish washer �700.
I hired the �700 team. They did some extra work including gas supply and fit a cooker. The bill? Still �700.
His firm are currently finishing installing 11 rad central heating, replumb of our large renovation property comprising 2 replanned bathrooms, plumbing and gas to our moved kitchen (even cutting hole and fitting hob), utility room and new downstairs wc. We have supplied sanitaryware and kitchen. Quote �5k. 2 plumbers on site most of 8 days. I am very happy with the price and the work.
It is not all price tho. The guys I have employed are part of a 5 man team. Although they are busy it means less of a wait for them than for a plumber working solo. And that is sometimes important.
My apologies re my quote which seems to have generated a little surprise reaction. Firsly, perhaps i should have stated that i am not a 'professional' plumber/tiler etc. However, in my own opinion and that of my many customers opinions, my work is equivelant to that of a 'professional'. I am a maintenance manager of a 17thc listed bulding in south Birmingham thus responsible for a wide range of issues, plumbing, painting , tiling etc, all my work has to be of a very high standard. In my own time i undertake work for householders\ buisnesses in my locality and as far as i am concerned the �100 per day is a fair rate. I know my own limitations and I often refuse work that i feel does require a PROFESSIONAL. Thanks.