Society & Culture1 min ago
Decorating After Damp Treatment
Hi all, my landlord has had my very damp wall treated. A membrane was put on the wall and it was plastered. He also had the Nuaire system in the loft and loft vents and fans in kitchen and bathroom and trickle vents installed in windows.
My question is ,how long do i wait to decorate and do i need to treat the newly plastered wall with anything special. Thanks
My question is ,how long do i wait to decorate and do i need to treat the newly plastered wall with anything special. Thanks
Answers
I'd also check first with the landlord. My daughter recently moved into a property which had been damp-proofed and her landlord has forbidden her to do anything for a few months. Is she does, and it goes pear shaped, she will be liable for any repair work.
19:03 Sun 13th May 2018
After the plaster has dried, I would apply a couple of coats of contract matt emulsion. This paint contains no additives such as vinyl. This allows any moisture in the wall to pass through the paint layer. Leave it for a couple of weeks and if there's no problems, decorate as usual.
BTW, thin the first coat with 20% water.
BTW, thin the first coat with 20% water.
Related Questions
Sorry, we can't find any related questions. Try using the search bar at the top of the page to search for some keywords, or choose a topic and submit your own question.