Quizzes & Puzzles11 mins ago
Rewiring A House
6 Answers
This house was built in 1952. It needs rewiring, I'm sure, as the wiring is from that time. Is there a rough and ready way of working out approximately how much that will cost; cost of labour per hour, materials etc; or am I reduced to getting quotes and 'flying blind' with no basic idea?
Answers
Best Answer
No best answer has yet been selected by FredPuli43. Once a best answer has been selected, it will be shown here.
For more on marking an answer as the "Best Answer", please visit our FAQ.Refer to the table here:
http:// www.wha tprice. co.uk/e lectric ian/wir ing.htm l
Click on the appropriate type of property and you'll then see some actual prices.
The 'Which?' website also has relevant information:
http:// local.w hich.co .uk/adv ice/cos t-price -inform ation-e lectric ians
http://
Click on the appropriate type of property and you'll then see some actual prices.
The 'Which?' website also has relevant information:
http://
I know His Brightness is on the case Fred, but it does depend on a number of things.
I'm only butting because I'm re-wiring a 3-bed semi right now. The house is being renovated, so it's completely empty. That does reduce the price.
If it helps, I'm putting in.......
2 x socket circuits
2 x lighting
1 x hob
1 x oven
Smokes/heat detectors
TV outlets
Telephone outlets
1 x boiler
.......... for just under £3,000 (near Exeter)
I'm only butting because I'm re-wiring a 3-bed semi right now. The house is being renovated, so it's completely empty. That does reduce the price.
If it helps, I'm putting in.......
2 x socket circuits
2 x lighting
1 x hob
1 x oven
Smokes/heat detectors
TV outlets
Telephone outlets
1 x boiler
.......... for just under £3,000 (near Exeter)
How likely is it that the contractor will have to lift floorboards on the ground floor? These are strip Japanese oak (you can tell the house is just post war; Japanese oak was dirt cheap!) and one floor is a sprung, oak, dance floor. Don't fancy the standard contractor lifting those. Upstairs is deal flooring, standard t and g, so no problem.